Good pairing strategy
- Prioritize daytime DHW charging where possible.
- Use sensible setpoint scheduling (not extreme swings).
- Monitor consumption and adjust in the first month.
PV can reduce operational cost — but only if the system is designed for the real demand profile and the controls don’t fight each other.